HomeMy WebLinkAbout17-21 PC Resolution PC RESOLUTION NO. 17-21 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF TEMECULA APPROVING PLANNING APPLICATION NO. PA16-0710, A DEVELOPMENT PLAN FOR AN APPROXIMATELY 53,574 SQUARE FOOT CONCRETE TILT-UP 2 STORY SHELL INDUSTRIAL BUILDING LOCATED AT 42006 REMINGTON AVE, AND MAKING A FINDING OF EXEMPTION UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) (APN 909-370-013) Section 1. Procedural Findings. The Planning Commission of the City of Temecula does hereby find, determine and declare that: A. On May 10, 2016, Petra Jordan filed Planning Application No. PA16-0710 Development Plan Application in a manner in accord with the City of Temecula General Plan and Development Code. B. The Application was processed including, but not limited to a public notice, in the time and manner prescribed by State and local law. C. The Planning Commission, at a regular meeting, considered the Application and environmental review on August 2, 2017, at a duly noticed public hearing as prescribed by law, at which time the City staff and interested persons had an opportunity to and did testify either in support or in opposition to this matter. D. At the conclusion of the Planning Commission hearing and after due consideration of the testimony, the Planning Commission approved Planning Application No. PA16-0710 subject to and based upon the findings set forth hereunder. E. All legal preconditions to the adoption of the Resolution have occurred. Section 2. Further Findings. The Planning Commission, in approving the Application hereby finds, determines and declares that: Development Plans, Development Code Section 17.05.010.F A. The proposed use is in conformance with the General Plan for Temecula and with all applicable requirements of State law and other Ordinances of the City; Industrial buildings are an allowable use within the Industrial Park General Plan designation. Therefore, the use will be consistent with General Plan for Temecula, as well as the requirements for State law and other Ordinances of the City. The Economic Development element of the General Plan specifically states, 'A strong base of clean manufacturing activities which employs a skilled labor force and can be successfully integrated into Temecula's community character." The development of additional industrial space will allow for increased manufacturing opportunities and subsequent employment. B. The overall development of the land is designed for the protection of the public health, safety, and general welfare. The project has been reviewed and conditioned to ensure conformance with the Development, Building, and Fire codes. These codes contain provisions designed to ensure the protection of the public health, safety, and general welfare. Section 3. Environmental Findings. The Planning Commission hereby makes the following environmental findings and determinations in connection with the approval of the Development Plan Application: A. In accordance with the California Environmental Quality Act, the proposed project has been deemed to be categorically exempt from further environmental review (Section 15332, Class 2, In-fill Development); 1. The project is consistent with the General Plan designation as the Industrial Park use explicitly permits light industrial uses. Additionally, the Light Industrial zoning designation permits industrial uses. The project is located within the city limits and the parcel is under 5 acres (the parcel is approximately 3.71 acres). No valuable habitat has been identified for endangered, rare, or threatened species. Significant effects related to traffic, noise, air quality or water quality are not projected outside of those anticipated in the General Plan. The site is adjacent to a completed street where utilities and public services can be adequately provided. Section 4. Conditions. The Planning Commission of the City of Temecula approves Planning Application No. PA16-0710, subject to the Conditions of Approval set forth on Exhibit A, attached hereto, and incorporated herein by this reference. Section 5. PASSED, APPROVED AND ADOPTED by the City of Temecula Planning Commission this 2nd day of August, 2017. John H. Telesio, Chairman ATTEST: Luke Watson Secretary [SEAL] STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE )ss CITY OF TEMECULA ) I, Luke Watson, Secretary of the Temecula Planning Commission, do hereby certify that the forgoing PC Resolution No. 17-21 was duly and regularly adopted by the Planning Commission of the City of Temecula at a regular meeting thereof held on the 2nd day of August, 2017, by the following vote: AYES: 4 PLANNING COMMISSIONERS: Guerriero, Telesio, Turley-Trejo, Youmans NOES: 0 PLANNING COMMISSIONERS: None ABSENT: 1 PLANNING COMMISSIONERS: Watts ABSTAIN: 0 PLANNING COMMISSIONERS: None uke Watson Secretary EXHIBIT A CITY OF TEMECULA FINAL CONDITIONS OF APPROVAL Planning Application No.: PA16-0710 Project Description: A Development Plan for an approximately 53,574 square foot concrete tilt-up 2 story shell industrial building located at 42006 Remington Avenue Assessor's Parcel No.: 909-370-013 MSHCP Category: Industrial DIF Category: Business Park/Industrial Park TUMF Category: Industrial/Business Park Quimby Category: N/A(non-residential) New Street In-lieu of Fee: N/A(not located within the Uptown Temecula Specific Plan) Approval Date: August 2, 2017 Expiration Date: August 2, 2020 PLANNING DIVISION Within 48 Hours of the Approval 1. Filing Notice of Exemption. The applicant/developer shall deliver to the Planning Division a cashier's check or money order made payable to the County Clerk in the amount of Fifty Dollars ($50.00) for the County administrative fee, to enable the City to file the Notice of Exemption as provided under Public Resources Code Section 21152 and California Code of Regulations Section 15062. If within said 48-hour period the applicant/ developer has not delivered to the Planning Division the check as required above, the approval for the project granted shall be void by reason of failure of condition (Fish and Wildlife Code Section 711.4(c)). General Requirements 2. Indemnification of the City. The applicant and owner of the real property subject to this condition shall hereby agree to indemnify, protect, hold harmless, and defend the City and its attorneys from any and all claims, actions, awards,judgments, or proceedings against the City to attack, set aside, annul, or seek monetary damages resulting, directly or indirectly, from any action in furtherance of and the approval of the City, or any agency or instrumentality thereof, advisory agency, appeal board or legislative body including actions approved by the voters of the City, concerning the Planning Application. The City shall be deemed for purposes of this condition, to include any agency or instrumentality thereof, or any of its elected or appointed officials, officers, employees, consultants, contractors, legal counsel, and agents. City shall promptly notify both the applicant and landowner of any claim, action, or proceeding to which this condition is applicable and shall further cooperate fully in the defense of the action. The City reserves the right to take any and all action the City deems to be in the best interest of the City and its citizens in regards to such defense. 3. Expiration. This approval shall be used within three years of the approval date; otherwise, it shall become null and void. Use means the beginning of substantial construction contemplated by this approval within the three-year period, which is thereafter diligently pursued to completion, or the beginning of substantial utilization contemplated by this approval, or use of a property in conformance with a Conditional Use Permit. 4. Conformance with Approved Plans. The development of the premises shall substantially conform to the approved site plan and elevations contained on file with the Planning Division. 5. Signage Permits. A separate building permit shall be required for all signage. 6. Landscape Maintenance. Landscaping installed for the project shall be continuously maintained to the reasonable satisfaction of the Director of Community Development. If it is determined that the landscaping is not being maintained, the Director of Community Development shall have the authority to require the property owner to bring the landscaping into conformance with the approved landscape plan. The continued maintenance of all landscaped areas shall be the responsibility of the developer or any successors in interest. 7. Graffiti. All graffiti shall be removed within 24 hours on telecommunication towers, equipment, walls, or other structures. 8. Water Quality and Drainage. Other than stormwater, it is illegal to allow liquids, gels, powders, sediment, fertilizers, landscape debris, and waste from entering the storm drain system or from leaving the property. To ensure compliance with this Condition of Approval: a. Spills and leaks shall be cleaned up immediately. b. Do not wash, maintain, or repair vehicles onsite. c. Do not hose down parking areas, sidewalks, alleys, or gutters. d. Ensure that all materials and products stored outside are protected from rain. e. Ensure all trash bins are covered at all times. 9. Paint Inspection. The applicant shall paint a three-foot-by-three-foot section of the building for Planning Division inspection, prior to commencing painting of the building. 10. Photographic Prints. The applicant shall submit to the Planning Division for permanent filing two 8" X 10" glossy photographic color prints of the approved color and materials board and the colored architectural elevations. All labels on the color and materials board and elevations shall be readable on the photographic prints. 11. Materials and Colors. The Conditions of Approval specified in this resolution, to the extent specific items, materials, equipment, techniques, finishes or similar matters are specified, shall be deemed satisfied by City staffs prior approval of the use or utilization of an item, material, equipment, finish or technique that City staff determines to be the substantial equivalent of that required by the Conditions of Approval. Staff may elect to reject the request to substitute, in which case the real party in interest may appeal, after payment of the regular cost of an appeal, the decision to the Planning Commission for its decision. 12. Modifications or Revisions. The permittee shall obtain City approval for any modifications or revisions to the approval of this project. 13. Trash Enclosures. The trash enclosures shall be large enough to accommodate a recycling bin, as well as regular solid waste containers. 14. Trash Enclosures. Trash enclosures shall be provided to house all trash receptacles utilized on the site. These shall be clearly labeled on the site plan. 15. Covered Trash Enclosures. All trash enclosures on site shall include a solid cover and the construction plans shall include all details of the trash enclosures, including the solid cover. 16. Construction and Demolition Debris. The developer shall contact the City's franchised solid waste hauler for disposal of construction and demolition debris and shall provide the Planning Division verification of arrangements made with the City's franchise solid waste hauler for disposal of construction and demolition debris. Only the City's franchisee may haul demolition and construction debris. 17. Public Art Ordinance. The applicant shall comply with the requirements of the City's Public Art Ordinance as defined in Section 5.08 of the Temecula Municipal Code. 18. Property Maintenance. All parkways, including within the right-of-way, entryway median, landscaping, walls, fencing, recreational facilities, and on-site lighting shall be maintained by the property owner or maintenance association. 19. Compliance with Riverside County Env. Health. The applicant shall comply with the recommendations set forth in the County of Riverside's Department of Environmental Health letter dated January 3, 2017, a copy of which is attached. Prior to Issuance of Grading Permit 20. Placement of Transformer. Provide the Planning Division with a copy of the underground water plans and electrical plans for verification of proper placement of transformer(s) and double detector check valves prior to final agreement with the utility companies. 21. Placement of Double Detector Check Valves. Double detector check valves shall be installed at locations that minimize their visibility from the public right-of-way, subject to review and approval by the Director of Community Development. 22. Archaeological/Cultural Resources Grading Note. The following shall be included in the Notes Section of the Grading Plan: "If at any time during excavation/construction of the site, archaeological/cultural resources, or any artifacts or other objects which reasonably appears to be evidence of cultural or archaeological resource are discovered, the property owner shall immediately advise the City of such and the City shall cause all further excavation or other disturbance of the affected area to immediately cease. The Director of Community Development at his/her sole discretion may require the property owner to deposit a sum of money it deems reasonably necessary to allow the City to consult and/or authorize an independent, fully qualified specialist to inspect the site at no cost to the City, in order to assess the significance of the find. Upon determining that the discovery is not an archaeological/cultural resource, the Planning Director shall notify the property owner of such determination and shall authorize the resumption of work. Upon determining that the discovery is an archaeological/cultural resource, the Planning Director shall notify the property owner that no further excavation or development may take place until a mitigation plan or other corrective measures have been approved by the Planning Director." 23. Cultural Resources Treatment Agreement. The developer is required to enter into a Cultural Resources Treatment Agreement with the Pechanga Tribe. The agreement shall be in place prior to issuance of a grading permit. To accomplish this, the applicant should contact the Pechanga Tribe no less than 30 days and no more than 60 days prior to issuance of a grading permit. This Agreement will address the treatment and disposition of cultural resources, the designation, responsibilities, and participation of professional of professional Pechanga Tribal monitors during grading, excavation and ground disturbing activities; project grading and development scheduling; terms of compensation for the monitors; and treatment and final disposition of any cultural resources, sacred sites, and human remains discovered onsite. The Pechanga monitor's authority to stop and redirect grading will be exercised in consultation with the project archaeologist in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. 24. Discovery of Cultural Resources. The following shall be included in the Notes Section of the Grading Plan: "If cultural resources are discovered during the project construction (inadvertent discoveries), all work in the area of the find shall cease, and the qualified archaeologist and the Pechanga monitor shall investigate the find, and make recommendations as to treatment." 25. Archaeological Monitoring Notes. The following shall be included in the Notes Section of the Grading Plan: "A qualified archaeological monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the Pechanga Tribe and their designated monitors, to evaluate the significance of any potential resources discovered on the property." 26. Tribal Monitoring Notes. The following shall be included in the Notes Section of the Grading Plan: "A Pechanga Tribal monitor will be present and will have the authority to stop and redirect grading activities, in consultation with the project archaeologist and their designated monitors, to evaluate the significance of any potential resources discovered on the property." 27. Relinquishment of Cultural Resources. The following shall be included in the Notes Section of the Grading Plan: "The landowner agrees to relinquish ownership of all cultural resources, including all archaeological artifacts that are found on the project area, to the Pechanga Tribe for proper treatment and disposition." 28. Preservation of Sacred Sites. The following shall be included in the Notes Section of the Grading Plan: "All sacred sites are to be avoided and preserved." 29. MSHCP Pre-Construction Survey. A 30-day preconstruction survey, in accordance with MSHCP guidelines and survey protocol, shall be conducted prior to ground disturbance. The results of the 30-day preconstruction survey shall be submitted to the Planning Division prior to scheduling the pre-grading meeting with Public Works. If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 30. Burrowing Owl Grading Note. The following shall be included in the Notes Section of the Grading Plan: "No grubbing/clearing of the site shall occur prior to scheduling the pre-grading meeting with Public Works. All project sites containing suitable habitat for burrowing owls, whether owls were found or not, require a 30-day preconstruction survey that shall be conducted within 30 days prior to ground disturbance to avoid direct take of burrowing owls. If the results of the survey indicate that no burrowing owls are present on-site, then the project may move forward with grading, upon Planning Division approval. If burrowing owls are found to be present or nesting on-site during the preconstruction survey, then the following recommendations must be adhered to: Exclusion and relocation activities may not occur during the breeding season, which is defined as March 1 through August 31, with the following exception: From March 1 through March 15 and from August 1 through August 31 exclusion and relocation activities may take place if it is proven to the City and appropriate regulatory agencies (if any) that egg laying or chick rearing is not taking place. This determination must be made by a qualified biologist." If construction is delayed or suspended for more than 30 days after the survey, the area shall be resurveyed. 31. Rough Grading Plans. A copy of the Rough Grading Plans shall be submitted and approved by the Planning Division. 32. Archaeologist Retained. Prior to beginning project construction, the Project Applicant shall retain a Riverside County qualified/City of Temecula approved archaeological monitor to monitor all ground-disturbing activities in an effort to identify any unknown archaeological resources. Any newly discovered cultural resource deposits shall be subject to a cultural resources evaluation (See PL-4). The archaeological monitor's authority to stop and redirect grading will be exercised in consultation with the Pechanga Tribe in order to evaluate the significance of any potential resources discovered on the property. Pechanga and archaeological monitors shall be allowed to monitor all grading, excavation and groundbreaking activities, and shall also have the limited authority to stop and redirect grading activities should an inadvertent cultural resource be identified. The archaeologist shall provide a final monitoring report at the end of all earthmoving activities to the City of Temecula, the Pechanga Tribe and the Eastern Information Center at UC, Riverside. 33. Human Remains. If human remains are encountered, California Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the Riverside County Coroner has made the necessary findings as to origin. Further, pursuant to California Public Resources Code Section 5097.98(b) remains shall be left in place and free from disturbance until a final decision as to the treatment and disposition has been made. If the Riverside County Coroner determines the remains to be Native American, the Native American Heritage Commission must be contacted within 24 hours. The Native American Heritage Commission must then immediately identify the "most likely descendant(s)" of receiving notification of the discovery. The most likely descendant(s) shall then make recommendations within 48 hours, and engage in consultations concerning the treatment of the remains as provided in Public Resources Code 5097.98 and the Treatment Agreement described in these conditions. Prior to Issuance of Building Permit 34. Parking Area Landscaping. The Landscaping and Irrigation Plans shall provide a minimum five-foot wide planter to be installed at the perimeter of all parking areas. Curbs, walkways, etc. are not to infringe on this area. 35. Transportation Uniform Mitigation Fee (TUMF). The City of Temecula adopted an ordinance on March 31, 2003 to collect fees for a Riverside County area wide Transportation Uniform Mitigation Fee (TUMF). This project is subject to payment of these fees at the time of building permit issuance. The fees are subject to the provisions of Chapter 15.08 of the Temecula Municipal Code and the fee schedule in effect at the time of building permit issuance. 36. Downspouts. All downspouts shall be internalized. 37. Development Impact Fee (DIF). The developer shall comply with the provisions of Title 15, Chapter 15.06 of the Temecula Municipal Code and all its resolutions by paying the appropriate City fee. 38. Photometric Plan. The applicant shall submit a photometric plan, including the parking lot, to the Planning Division, which meets the requirements of the Development Code and the Riverside County Palomar Lighting Ordinance 655. All exterior LED light fixtures shall be 3,000 kelvin or below. The parking lot light standards shall be placed in such a way as to not adversely affect the growth potential of the parking lot trees. 40. Construction Landscaping and Irrigation Plans. Four (4) copies of Construction Landscaping and Irrigation Plans shall be reviewed and approved by the Planning Division. These plans shall be submitted as a separate submittal, not as part of the building plans or other plan set. These plans shall conform to the approved conceptual landscape plan, or as amended by these conditions. The location, number, height and spread, water usage or KC value, genus, species, and container size of the plants shall be shown. The plans shall be consistent with the Water Efficient Ordinance and Water Storage Contingency Plan per the Rancho California Water District. The plans shall be accompanied by the appropriate filing fee (per the City of Temecula Fee Schedule at time of submittal) and one copy of the approved Grading Plan. 41. Landscaping Site Inspections. The Landscaping and Irrigation Plans shall include a note stating, "Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. 42. Agronomic Soils Report. The Landscaping and Irrigation Plans shall include a note on the plans stating, "The contractor shall provide two copies of an agronomic soils report at the first irrigation inspection." 43. Water Usage Calculations. The Landscaping and Irrigation Plans shall include water usage calculations per Chapter 17.32 of the Development Code (Water Efficient Ordinance), the total cost estimate of plantings and irrigation (in accordance with approved plan). Applicant shall use evapotranspiration (ETo) factor of 0.70 for calculating the maximum allowable water budget. 44. Landscape Maintenance Program. A landscape maintenance program shall be submitted to the Planning Division for approval. The landscape maintenance program shall detail the proper maintenance of all proposed plant materials to assure proper growth and landscape development for the long-term esthetics of the property. The approved maintenance program shall be provided to the landscape maintenance contractor who shall be responsible to carry out the detailed program. 45. Specifications of Landscape Maintenance Program. Specifications of the landscape maintenance program shall indicate, "Three landscape site inspections are required. The first inspection will be conducted at installation of irrigation while trenches are open. This will verify that irrigation equipment and layout is per plan specifications and details. Any adjustments or discrepancies in actual conditions will be addressed at this time and will require an approval to continue. Where applicable, a mainline pressure check will also be conducted. This will verify that the irrigation mainline is capable of being pressurized to 150 psi for a minimum period of two hours without loss of pressure. The second inspection will verify that all irrigation systems are operating properly, and to verify that all plantings have been installed consistent with the approved construction landscape plans. The third inspection will verify property landscape maintenance for release of the one-year landscape maintenance bond." The applicant/owner shall contact the Planning Division to schedule inspections. 46. Irrigation. The landscaping plans shall include automatic irrigation for all landscaped areas and complete screening of all ground mounted equipment from view of the public from streets and adjacent property for private common areas; front yards and slopes within individual lots; shrub planting to completely screen perimeter walls adjacent to a public right-of-way equal to 66 feet or larger; and, all landscaping excluding City maintained areas and front yard landscaping which shall include, but may not be limited to, private slopes and common areas. 47. Hardscaping. The landscape plans shall include all hardscaping for equestrian trails and pedestrian trails within private common areas. 48. Precise Grading Plans. Precise Grading Plans shall be consistent with the approved rough grading plans including all structural setback measurements. 49. Building Construction Plans for Outdoor Areas. Building Construction Plans shall include detailed outdoor areas (including but not limited to trellises, decorative furniture, fountains, hardscape, etc.) to match the style of the building subject to the approval of the Director of Community Development. 50. WQMP Landscape Compliance. The construction landscape plans shall be consistent with Appendix A, Table 31 of the Low Impact Development (LID) Manual for Southern California for plant materials and treatment facilities, and shall reference the approved precise grading plan for WQMP features. 51. Utility Screening. All utilities shall be screened from public view. Landscape construction drawings shall show and label all utilities and provide appropriate screening. Provide a three-foot clear zone around fire check detectors as required by the Fire Department before starting the screen. Group utilities together in order to reduce intrusion. Screening of utilities is not to look like an after-thought. Plan planting beds and design around utilities. Locate all light poles on plans and ensure that there are no conflicts with trees. Prior to Release of Power, Building Occupancy or Any Use Allowed by This Permit 52. Letter of Substantial Conformance. The applicant shall submit a letter of substantial conformance, subject to field verification by the Director of Community Development or his/her designee. Said letter of substantial conformance shall be prepared by the project designer and shall indicate that all plant materials and irrigation system components have been installed in accordance with the approved final landscape and irrigation plans. Such letter of substantial conformance shall be submitted prior to scheduling for the final inspection. 53. Screening of Loading Areas. The applicant shall be required to screen all loading areas and roof mounted mechanical equipment from view of the adjacent residences and public right-of-ways. If upon final inspection it is determined that any mechanical equipment, roof equipment or backs of building parapet walls are visible from any portion of the public right-of-way adjacent to the project site, the developer shall provide screening by constructing a sloping tile covered mansard roof element or other screening reviewed and approved by the Director of Community Development. 54. Landscape Installation Consistent with Construction Plans. All required landscape planting and irrigation shall have been installed consistent with the approved construction plans and shall be in a condition acceptable to the Director of Community Development. The plants shall be healthy and free of weeds, disease, or pests. The irrigation system shall be properly constructed and in good working order. 55. Performance Securities. Performance securities, in amounts to be determined by the Director of Community Development, to guarantee the maintenance of the plantings in accordance with the approved construction landscape and irrigation plan, shall be filed with the Planning Division for a period of one year from final Certificate of Occupancy. After that year, if the landscaping and irrigation system have been maintained in a condition satisfactory to the Director of Community Development, the bond shall be released upon request by the applicant. 56. Installation of Site Improvements. All site improvements, including but not limited to, parking areas and striping shall be installed. 57. Compliance with Conditions of Approval. All of the foregoing conditions shall be complied with prior to occupancy or any use allowed by this permit. Outside Agencies 58. Compliance with Dept. of Environmental Health. The applicant shall comply with the recommendations set forth in the County of Riverside Department of Environmental Health transmittal dated January 3, 2017, a copy of which is attached. 59. Compliance with RCWD. The applicant shall comply with the recommendations set forth in the Rancho California Water District's transmittal dated June 6, 2016, a copy of which is attached. PUBLIC WORKS DEPARTMENT General Requirements 60. Conditions of Approval. The developer shall comply with all Conditions of Approval, the Engineering and Construction Manual and all City codes/standards at no cost to any governmental agency. 61. Entitlement Approval. The developer shall comply with the approved site plan, the conceptual Water Quality Management Plan (WQMP) and other relevant documents approved during entitlement. Any significant omission to the representation of site conditions may require the plans to be resubmitted for further review and revision. 62. Precise Grading Permit. A precise grading permit for on site improvements (outside of public right-of-way) shall be obtained from Public Works. 63. Haul Route Permit. A haul route permit may be required when soils are moved on public roadways to or from a grading site. The developer/contractor is to verify if the permit is required. If so, he shall comply with all conditions and requirements per the City's Engineering and Construction Manual and as directed by Public Works. 64. Encroachment Permits. Prior to commencement of any applicable construction, encroachment permit(s) are required; and shall be obtained from Public Works for public offsite improvements. Prior to Issuance of a Grading Permit 65. Environmental Constraint Sheet (ECS). The developer shall comply with all constraints per the recorded ECS with any underlying maps related to the subject property. 66. Grading/Erosion & Sediment Control Plan. The developer shall submit a grading/erosion & sediment control plan(s) to be reviewed and approved by Public Works. All plans shall be coordinated for consistency with adjacent projects and existing improvements contiguous to the site. The approved plan shall include all construction-phase pollution-prevention controls to adequately address non-permitted runoff. Refer to the City's Engineering & Construction Manual at: www.TemeculaCA.gov/ECM 67. Erosion & Sediment Control Securities. The developer shall comply with the provisions of Chapter 24, Section 18.24.140 of the Temecula Municipal Code by posting security and entering into an agreement to guarantee the erosion & sediment control improvements. 68. NPDES General Permit Compliance. The developer shall obtain project coverage under the State National Pollutant Discharge Elimination System (NPDES) General Permit for Construction Activities and shall provide the following: a. A copy of the Waste Discharge Identification Number (WDID) issued by the State Water Resources Control Board (SWRCB); b. The project's Risk Level (RL) determination number; and c. The name, contact information and certification number of the Qualified SWPPP Developer(QSD) Pursuant to the State Water Resources Control Board (SWRCB) requirements and City's storm water ordinance, a Storm Water Pollution Prevention Plan (SWPPP) shall be generated and submitted to the Board. Throughout the project duration, the SWPPP shall be routinely updated and readily available (onsite) to the State and City. Review www.cabmphandbooks.com for SWPPP guidelines. Refer to the following link: http://www.waterboards.ca.gov/water issues/programs/stormwater/construction.shtmi 69. Water Quality Management Plan (WQMP) and O&M Agreement. The developer shall submit a final WQMP (prepared by a registered professional engineer) with the initial grading plan submittal, based on the conceptual WQMP from the entitlement process. It must receive acceptance by Public Works. A copy of the final project-specific WQMP must be kept onsite at all times. In addition, a completed WQMP Operation and Maintenance (O&M) Agreement shall be submitted for review and approval. Upon approval from City staff, the applicant shall record the O&M agreement at the County Recorder's Office in Temecula. Refer to the WQMP template and agreement link below: www.TemeculaCA.gov/WQMP 70. Area Drainage Plan (ADP) Fee to RCFC&WCD. The developer shall demonstrate to the City that the flood mitigation charge (ADP fee) has been paid to RCFC&WCD. If the full ADP fee has already been credited to this property, no new charge will be required. 71. Drainage. All applicable drainage shall be depicted on the grading plan and properly accommodated with onsite drainage improvements and water quality facilities, which shall be privately maintained. Alterations to existing drainage patterns or concentration and/or diverting flows is not allowed unless the developer constructs adequate drainage improvements and obtains the necessary permissions from the downstream property owners. All drainage leaving the site shall be conveyed into a public storm drain system, if possible. The creation of new cross lot drainage is not permitted. 72. Drainage Study. A drainage study shall be prepared by a registered civil engineer and submitted to Public Works with the initial grading plan check in accordance with City, Riverside County and engineering standards. The study shall identify storm water runoff quantities (to mitigate the 100-year storm event) from the development of this site and upstream of the site. It shall identify all existing or proposed offsite or onsite, public or private, drainage facilities intended to discharge this runoff. Runoff shall be conveyed to an adequate outfall capable of receiving the storm water runoff without damage to public or private property. The study shall include a capacity analysis verifying the adequacy of all facilities. Any upgrading or upsizing of drainage facilities necessary to convey the storm water runoff shall be provided as part of development of this project. 73. Floodplain/Floodway Development. The site is in an area identified on the Flood Insurance Rate Map. This project shall comply with Chapter 15.12 of the Temecula Municipal Code which may include obtaining a Letter of Map Revision from FEMA. A Flood Plain Development Permit shall be submitted to the Department of Public Works for review and approval. 74. Soils Report. A soils report, prepared by a registered soil or civil engineer, shall be submitted to Public Works with the initial grading plan submittal. The report shall address the site's soil conditions and provide recommendations for the construction of engineered structures and preliminary pavement sections. 75. Geological Report. The developer shall complete any outstanding County geologist's requirements, recommendations and/or proposed Conditions of Approval as identified during entitlement. 76. Letter of Permission/Easement. The developer shall obtain documents (letters of permission or easements) for any offsite work performed on adjoining properties. The document's format is as directed by, and shall be submitted to, Public Works for acceptance. The document information shall be noted on the approved grading plan. 77. Sight Distance. The developer shall limit landscaping in the corner cut-off area of all street intersections and adjacent to driveways to provide for minimum sight distance and visibility. 78. Habitat Conservation Fee. The developer shall comply with the provisions of Chapter 8.24 of the Temecula Municipal Code (Habitat Conservation) by paying the appropriate fee set forth in the ordinance or by providing documented evidence that the fees have already been paid. Prior to Issuance of Encroachment Permit(s) 79. Public Utility Agency Work. The developer shall submit all relevant documentation due to encroaching within City right-of-way; and is responsible for any associated costs and for making arrangements with each applicable public utility agency. 80. Traffic Control Plans. A construction area traffic control plan (TCP) will be required for lane closures and detours or other disruptions to traffic circulation; and shall be reviewed and approved by Public Works. The TCP shall be designed by a registered civil or traffic engineer in conformance with the latest edition of the Caltrans Manual on Uniform Traffic Control Devices (MUTCD) and City standards. 81. Improvement Plans. All improvement plans (including but not limited to street, storm drain, traffic) shall be reviewed and approved by Public Works. 82. Street Trenching. All street trenches shall conform to City Standard No. 407; refer to the City's Paving Notes. Prior to Issuance of Building Permit(s) 83. Western Bypass Corridor. The developer shall record a written offer to participate in, and waive all rights to object to the formation of an Assessment District, a Community Facilities District, or a Bridge and Major Thoroughfare Fee District for the construction of the the proposed Western Bypass Corridor in accordance with the General Plan. The form of the offer shall be approved by the City. 84. Certifications. Certifications are required from the registered civil engineer-of-record certifying the building pad elevation(s) per the approved plans and from the soil's engineer-of-record certifying compaction of the building pad(s). Prior to Issuance of a Certificate of Occupancy 85. Completion of Improvements. The developer shall complete all work per the approved plans and Conditions of Approval to the satisfaction of the City Engineer. This includes all on site work (including water quality facilities), public improvements and the executed WQMP Operation and Maintenance agreement. 86. Utility Agency Clearances. The developer shall receive written clearance from applicable utility agencies (i.e., Rancho California and Eastern Municipal Water Districts, etc.) for the completion of their respective facilities and provide to Public Works. 87. Replacement of Damaged Improvements/Monuments. Any appurtenance damaged or broken during development shall be repaired or removed and replaced to the satisfaction of Public Works. Any survey monuments damaged or destroyed shall be reset per City Standards by a qualified professional pursuant to the California Business and Professional Code Section 8771. 88. Certifications. All necessary certifications and clearances from engineers, utility companies and public agencies shall be submitted as required by Public Works. BUILDING AND SAFETY DIVISION General Requirements 89. Final Building and Safety Conditions. Final Building and Safety conditions will be addressed when building construction plans are submitted to Building and Safety for review. These conditions will be based on occupancy, use, the California Building Code (CBC), and related codes which are enforced at the time of building plan submittal. 90. Compliance with Code. All design components shall comply with applicable provisions of the 2016 edition of the California Building, Plumbing and Mechanical Codes; 2016 California Electrical Code; California Administrative Code, 2016 California Energy Codes, 2016 California Green Building Standards, California Title 24 Disabled Access Regulations, and City of Temecula Municipal Code. 91. ADA Access. Applicant shall provide details of all applicable disabled access provisions and building setbacks on plans to include: a. Disabled access from the public way to the main entrance of the building. b. Van accessible parking located as close as possible to the main entry. c. Path of accessibility from parking to furthest point of improvement. d. Path of travel from public right-of-way to all public areas on site, such as club house, trash enclosures ,and picnic areas. 92. County of Riverside Mount Palomar Ordinance. Applicant shall submit, at time of plan review, a complete exterior site lighting plan showing compliance with County of Riverside Mount Palomar Ordinance Number 655 for the regulation of light pollution. All streetlights and other outdoor lighting shall be shown on electrical plans submitted to the Building and Safety Division. Any outside lighting shall be hooded and aimed not to shine directly upon adjoining property or public rights-of-way. 3000K maximum LED on exterior lighting. 93. Street Addressing. Applicant must obtain street addressing for all proposed buildings by requesting street addressing and submitting a site plan for commercial or multi-family residential projects or a recorded final map for single-family residential projects. 94. Clearance from TVUSD. A receipt or clearance letter from the Temecula Valley Unified School District shall be submitted to the Building and Safety Department to ensure the payment or exemption from School Mitigation Fees. 95. Obtain Approvals Prior to Construction. Applicant must obtain all building plans and permit approvals prior to commencement of any construction work. 96. Obtaining Separate Approvals and Permits. Trash enclosures, patio covers, light standards, and any block walls will require separate approvals and permits. 97. Demolition. Demolition permits require separate approvals and permits. 98. Sewer and Water Plan Approvals. On-site sewer and water plans will require separate approvals and permits. 99. Hours of Construction. Signage shall be prominently posted at the entrance to the project, indicating the hours of construction, as allowed by the City of Temecula Municipal Ordinance 9.20.060, for any site within one-quarter mile of an occupied residence. The permitted hours of construction are Monday through Saturday from 7:00 a.m. to 6:30 p.m. No work is permitted on Sundays and nationally recognized Government Holidays. 100. House Electrical Meter. Provide a house electrical meter to provide power for the operation of exterior lighting, irrigation pedestals and fire alarm systems for each building on the site. Developments with single user buildings shall clearly show on the plans how the operation of exterior lighting and fire alarm systems when a house meter is not specifically proposed. 101. Protection of drains and penetration. Protection of joints and penetrations in fire resistance-rated assemblies shall not be concealed from view until inspected for all designed fire protection. Required fire seals/fire barriers in fire assemblies at fire resistant penetrations shall be installed by individuals with classification or certification covering the installation of these systems. Provide certification for the installation of each area and certification of compliance for Building Official's approval. At Plan Review Submittal 102. Submitting Plans and Calculations. Applicant must submit to Building and Safety four (4) complete sets of plans and two (2) sets of supporting calculations for review and approval including: a. An electrical plan including load calculations and panel schedule, plumbing schematic, and mechanical plan applicable to scope of work b. A precise grading plan to verify accessibility for persons with disabilities. c. Truss calculations that have been stamped by the engineer of record of the building and the truss manufacturer engineer. Prior to Issuance of Grading Permit(s) 103. Onsite Water and Sewer Plans. Onsite water and sewer plans, submitted separately from the building plans, shall be submitted to Building and Safety for review and approval. 104. Demolition Permits. A demolition permit shall be obtained if there is an existing structure to be removed as part of the project. Prior to Issuance of Building Permit(s) 105. Plans Require Stamp of Registered Professional. Applicant shall provide appropriate stamp of a registered professional with original signature on the plans. Prior to Beginning of Construction 106. Pre-Construction Meeting. A pre-construction meeting is required with the building inspector prior to the start of the building construction. FIRE PREVENTION General Requirements 107. Fire Hydrants. The Fire Prevention Bureau is required to set minimum fire hydrant distances per CFC Appendix C. Standard fire hydrants (6" x 4" x (2) 2 '/2" outlets) shall be located on fire access roads and adjacent public streets. For all Commercial projects hydrants shall be spaced at 350 feet apart, and shall be located no more than 210 feet from any point on the street or Fire Department access road(s) frontage to a hydrant. The required fire flow shall be available from any adjacent hydrant(s) in the system, whether its public or private. The fire line may be required to be a looped system. The upgrade of existing fire hydrants may be required (CFC Appendix C and Temecula City Ordinance 15.16.020). 108. Fire Hydrant Clearance. As required by the California Fire Code, when any portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet from a hydrant on a fire apparatus road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. (CFC Chapter 5). 109. Fire Dept. Plan Review. Final fire and life safety conditions will be addressed when building plans are reviewed by the Fire Prevention Bureau. These conditions will be based on occupancy, use, the California Building Code (CBC), California Fire Code (CFC), and related codes which are in force at the time of building plan submittal. 110. Fire Flow. The Fire Prevention Bureau is required to set a minimum fire flow for the remodel or construction of all commercial and residential buildings per CFC Appendix B. The developer shall provide for this project, a water system capable of delivering 4,000 GPM at 20-PSI residual operating pressure for a 4-hour duration for commercial projects. The fire flow as given above has taken into account all information as provided. (CFC Appendix B and Temecula City Ordinance 15.16.020). Prior to Issuance of Grading Permit(s) 111. Access Road Widths. Fire Department vehicle access roads shall have an unobstructed width of not less than 24 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches (CFC Chapter 5 and City Ordinance 15.16.020). 112. Two Point Access. This development shall maintain two points of access, via all-weather surface roads, as approved by the Fire Prevention Bureau (CFC Chapter 5). 113. Turning Radius (Cul-de-sac). Minimum turning radius shall be 45 feet for commercial projects (CFC Chapter 5 along with Temecula City Ordinance 15.16.020). 114. All Weather Access Roads. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be with a surface to provide all-weather driving capabilities. Access roads shall be 80,000 lbs. GVW with a minimum of AC thickness of .25 feet. In accordance with Section 3310.1, prior to building construction, all locations where structures are to be built shall have fire apparatus access roads. (CFC Chapter 5 and City Ordinance 15.16.020). 115. Gradient of Access Roads. The gradient for fire apparatus access roads shall not exceed 15 percent(CFC Chapter 5 and City Ordinance 15.16.020). 116. Turning Radius. Dead end roadways and streets in excess of 150 feet which have not been completed shall have a turnaround capable of accommodating fire apparatus (CFC Chapter 5 and City Ordinance 15.16.020). Prior to Issuance of Building Permit(s) 117. Required Submittals (Fire Underground Water). The developer shall furnish three copies of the water system plans to the Fire Prevention Bureau for approval prior to installation for all private water systems pertaining to the fire service loop. Plans shall be signed by a registered civil engineer, contain a Fire Prevention Bureau approval signature block, and conform to hydrant type, location, spacing and minimum fire flow standards. Hydraulic calculations will be required with the underground submittal to ensure fire flow requirements are being met for the on-site hydrants. The plans must be submitted and approved prior to building permit being issued (CFC Chapter 33 and Chapter 5). 118. Required Submittals (Fire Sprinkler Systems). Fire sprinkler plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of sprinkler plans must be submitted by the installing contractor to the Fire Prevention Bureau. These plans must be submitted prior to the issuance of building permit. 119. Required Submittals (Fire Alarm Systems). Fire alarm plans shall be submitted to the Fire Prevention Bureau for approval. Three sets of alarm plans must be submitted by the installing contractor to the Fire Prevention Bureau. The fire alarm system is required to have a dedicated circuit from the house panel. These plans must be submitted prior to the issuance of building permit. Prior to Issuance of Certificate of Occupancy 120. Gates and Access. All manual and electronic gates on required Fire Department access roads or gates obstructing Fire Department building access shall be provided with the Knox Rapid entry system for emergency access by firefighting personnel (CFC Chapter 5). 121. Hydrant Verification. Hydrant locations shall be identified by the installation of reflective markers (blue dots) (City Ordinance 15.16.020). 122. Knox Box. A "Knox-Box" shall be provided. The Knox-Box shall be installed a minimum of six feet in height and be located to the right side of the fire riser sprinkler room (CFC Chapter 5). 123. Addressing. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Commercial buildings shall have a minimum of 12-inch numbers with suite numbers being a minimum of six inches in size. All suites shall have a minimum of 6-inch high letters and/or numbers on both the front and rear doors. (CFC Chapter 5 and City Ordinance 15.16.020). 124. Site Plan. The applicant shall prepare and submit to the Fire Department for approval, a site plan designating fire lanes with appropriate lane painting and/or signs (CFC Chapter 5). ,,ME N iq t y F9 County of Riverside DEPARTMENT OF ENVIRONMENTAL HEALTH n P.O. BOX 7909 • RIVERSIDE, CA 92513-7909 G�TyOFRNSTEVE VAN STOCKUM, DIRECTOR January 3, 2017 City of Temecula Planning Department Attn: Brandon Rabidou 41000 Main Street Temecula, CA 92590 SUBJECT: CITY OF TEMECULA—Planning Application PA16-0710 42006 Remington Avenue, Temecula APN:909-370-013 Dear Mr. Rabidou: The project listed in the subject heading of this letter is proposing a 53,574 square foot concrete tilt-up 2 story shell industrial building located at 42006 Remington Avenue in the City of Temecula. The Department of Environmental Health (DEH) offers the following comments: WATER AND WASTEWATER A general condition shall be placed on this project indicating that it will be serviced for water and sanitary sewer service by Rancho California Water District(RCWD). As the sewer agency, RCWD shall have the responsibility of determining any grease interceptor or other requirements, including but not limited to sizing capacity and other structural specifications. Please note that it is the responsibility of the proposed facility to ensure that all requirements to receive potable water service and sanitary sewer service are met with the appropriate purveyors, as well as, all other applicable agencies. Note: A General Condition shall be placed on this project indicating that any existing wells and/or existing onsite wastewater treatment systems (OWTS) shall be properly removed and/or abandoned under permit with the Department of Environmental Health (DEH). Office locations • Blythe • Corona • Hemet * Indio • Murrieta • Palm Springs • Riverside Phone (888)722-4234 www rivr ph nrn ENVIRONMENTAL CLEANUP PROGRAM(ECP) The Environmental Cleanup Program(ECP) has reviewed the environmental site assessment report submitted for this project. Based on the information provided in the report and a site visit conducted by ECP staff and with the provision that the information was accurate and representative of site conditions, the ECP concludes no further environmental assessment is required for this project. If previously unidentified contamination or the presence of a naturally occurring hazardous material is discovered at the site, assessment, investigation, and/or cleanup may be required. Contact Riverside County Environmental Health - Environmental Cleanup Programs at(951) 955-8980, for further information. HAZARDOUS MATERIALS MANAGEMENT BRANCH(HMMB) Prior to conducting a Building Final, the facility shall require a business emergency plan for the storage of any hazardous materials, greater than 55 gallons, 200 cubic feet or 500 pounds, or any acutely hazardous materials or extremely hazardous substances. If further review of the site indicates additional environmental health issues, HMMB reserves the right to regulate the business in accordance with applicable County Ordinances. Please contact HMMB at(951) 358- 5055 to obtain information regarding any additional requirements. Should you have any further questions or require further assistance, please contact me by email at kakim(&rivcocha.org or by phone at(951) 955-8980. Sincerely, Kristine Kim, REHS Environmental Protection and Oversight Division Land Use and Water Resources Program SR35563 i June 6, 2016 Brandon Rabidou, Case Planner Rancho City of Temecula water 41000 Main Street Temecula, CA 92590 SUBJECT: WATER AND SEWER AVAILABILITY Board of Directors REMINGTON INDUSTRIAL PARK DEVELOPMENT; 42006 REMINGTON AVENUE, CASE/PLAN NO. PA16- Presiideennt am E.Plummer 42006 PARCEL NO. 2 OF PARCEL MAP NO. 24085-3; President Ben R.Drake APN 909-370-013 [JORDAN PETRA] Senior Vice President Stephen J.Corona Dear Mr. Rabidou: Lisa D.Herman Please be advised that the above-referenced project/property is located within John E.Hoagland the service boundaries of Rancho California Water District (RCWD/District). Danny J.Martin The subject project/property fronts an existing 12-inch diameter water pipeline Bill J.Wilson (1305 Pressure Zone) and an existing 8-inch diameter sewer pipeline within Officers Remington Avenue. Please refer to the enclosed exhibit map. Jeffrey D.Armstrong General Manager eager Water/sewer service to the subject project/property does not exist. Additions or Richard R.Aragon,CPFO modifications to water/sewer service arrangements are subject to the Rules and Director of Financefrreastmr Regulations (governing) Water/Sewer System Facilities and Service, as well as Jason A.Martin the completion of financial arrangements between RCWD and the property Director of Administration owner. Rich Ottolini,R.E.H.S.,MSL Interim Director of Operations &Maintenance Water/sewer service to individual lots will require the extension of water Andrew L.Webster,P.E. facilities within dedicated public and/or private right-of-ways. Individual water Chief Engineer meters will be required for each lot and/or project unit, including separate water Kelli E.Garcia services/meters for domestic service, fire service, and landscape irrigation District Secretary service, as applicable. James B.Gilpin Best Best&Krieger LLP General Counsel Where private on-site water facilities (for water service, fire service, irrigation, or other purpose) will cross or will be shared amongst multiple lots/project units (only by special variance of the Rules and Regulations), and/or where such `common' facilities will be owned and maintained by a Property Owners' Association, RCWD requires execution and recordation of a Reciprocal Easement and Maintenance Agreement or equivalent document of covenants, codes, and restrictions. Water availability is contingent upon the property owner(s) destroying all on- site wells and signing an Agency Agreement that assigns water management rights, if any, to RCWD. In addition, water availability is subject to water supply shortage contingency measures in effect (pursuant to RCWD's Water Shortage Contingency Plan or other applicable ordinances and policy), and/or the adoption of a required Water Supply Assessment for the development,as determined by the Lead Agency. Rancho California Water District 1 2G V rn 4.Pear n4l­P-Li I1 7.T-­d, r %;in... ))4Qo on,1 . o Z I\)ol.AUCV).r IV.o,1 )U!._A ITln......:....nnnhn....ro.ten... Brandon a o ty of Temecula June 6,2016 Page Two In accordance with Resolution 2007-10-5, the project/property will be required to use recycled water for all landscape irrigation, which should be noted as a condition for any subsequent development plans. Recycled water service, therefore, would be available upon construction of any required on-site and/or off-site recycled water facilities and the completion of financial arrangements between RCWD and the property owner. Requirements for the use of recycled water are available from RCWD. As soon as feasible, and prior to the preparation of California Environmental Quality Act (CEQA) documents, the project proponent should contact RCWD for a determination of existing water/sewer system capability, based upon project-specific demands and/or fire flow requirements, as well as a determination of proposed water/sewer facilities configuration and sewer pretreatment requirements. If new facilities are required for service, fire protection, or other purposes, the project proponent should contact RCWD for an assessment of project- specific fees and requirements. If you should have any questions or need additional information, please contact an Engineering Services Representative at the District office at (951) 296-6900. Sincerely, RANCHO CALIFORNIA WATER DISTRICT Kim Kerckhoff Engineering Services Representative Enclosure: Exhibit Map cc: Corey Wallace,Engineering Manager-CIP&Development Phillip Dauben,Associate Engineer Corry Smith,Engineering Services Supervisor Jordan Petra,Ken Smith Architects 16\KK:hab022\F450\FEG \ <c j •�'•v laaCA; S 8• X y ae0 f� ' �►``'G 909370013 j i s' pJGi 1'ypy ;. Q�oy1'' g�1 /QJGty e��ry, VWyQ� ,tY Monday, June 06, 2016 Exhibit Map